Rulemaking Proceedings
Rules for the Department of Energy and the Public Utilities Commission govern utilities, energy providers, and other entities subject to the Department's or the Commission’s authority.
RUL 2024-007 - Department of Energy Chapter En 1000 Interconnection of Distributed Electric Energy Resources
The Department is adopting rules pursuant to RSA 12-P:5, IV, related to net metering and interconnection of distributed energy resources to the infrastructure of New Hampshire's investor-owned electric utilities. The Department initially opened a single proceeding, RUL 2024-005, to adopt these rules, but after a November 18, 2024, stakeholder session, the Department decided to open a separate rulemaking proceeding, RUL 2024-007, to consider the interconnection rules. Going forward, RUL 2024-005 will consider only the net metering rules. For information about the interconnection rulemaking before November 18, 2024, please see RUL 2024-005.
- En 900 Summary and Request for Comments Following November 18, 2024, Stakeholder Session
- En 1000 Bright Spot Solar Comments Regarding Cost Shifting
- En 1000 W. Packy Campbell Comments Regarding En 1000 Rulemaking
- En 1000 W. Packy Campbell Comment Regarding SB391 Customer Generation
- En 1000 Bright Spot Solar Comments Regarding Rulemaking and SB391
- En 1000 W. Packy Campbell Comments Regarding Customer Generation Interconnection Rules
- En 1000 Interstate Renewable Energy Council Comments Set 1
- En 1000 Interstate Renewable Energy Council Comments Set 2
- En 1000 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-1
- En 1000 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-2
- En 1000 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-3
- En 1000 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-6 (RR 6)
- En 1000 Fitchburg Gas and Electric Light Company Interconnection Tariff
- En 1000 NStar d/b/a Eversource Energy Interconnection Tariff
- En 1000 Joint Response to Order of Notice Questions
- En 1000 Agenda for Technical Session #2 on January 9, 2025
- En 1000 Joint Responses to Set #2 Questions
- En 1000 Liberty Responses to Set #2 Questions
- En 1000 Summary Following January 9, 2025 Stakeholder Session
RUL 2024-006 - Department of Energy Chapter En 200 Procedural Rules
The Department is adopting practice and procedural rules pursuant to RSA 12-P:5, IV, enacted effective July 1, 2021, as amended effective July 1, 2021.
- En 200 Rules (En 201.05) Fiscal Impact Statement Request Cover Letter (10/16/24)
- En 200 Rules (En 201.05) Fiscal Impact Statement Request
- En 200 Rules (En 201.05) Initial Proposal
- En 200 Rules (En 201.05) Fiscal Impact Statement
- En 200 Rules (En 201.05) Rulemaking Notice Cover Letter (10/24/24)
- En 200 Rules (En 201.05) Rulemaking Notice Appendix II-C Form
- En 200 Rules (En 201.05) OLS Comments to Initial Proposal (11/25/24)
- En 200 Rules (En 201.05) Joint Utilities' Comments to Initial Proposal (12/5/24)
- En 200 Rules (En 201.05) Final Proposal Cover Letter (12/24/24)
- En 200 Rules (En 201.05) Appendix II-G Final Proposal Cover Sheet
- En 200 Rules (En 201.05) Report on Public Comments
- En 200 Rules (En 201.05) Final Proposal - Fixed Text
- En 200 Rules (En 201.05) Final Proposal - Annotated Text
- En 200 Rules (En 201.05) JLCAR Final Proposal Approval Letter (01/17/25)
- En 200 Rules (En 201.05) Adopted Rules Cover Letter (01/21/25)
- En 200 Rules (En 201.05) Adopted Rule
- En 200 Rules (En 201.05) Adoption Receipt (01/22/25)
RUL 2024-005 - Department of Energy Chapter En 900 Rules Net Metering for Customer-Owned Renewable Energy Generation Resources of 1,000 Kilowatts or Less
The Department is adopting rules pursuant to RSA 12-P:5, IV, related to net metering and interconnection of distributed energy resources to the infrastructure of New Hampshire's investor-owned electric utilities. The Department initially opened a single proceeding, RUL 2024-005, to adopt these rules, but after a November 18, 2024, stakeholder session, the Department decided to open a separate rulemaking proceeding, RUL 2024-007, to consider the interconnection rules. Going forward, RUL 2024-005 will consider only the net metering rules. See RUL 2024-007 for information about the interconnection rulemaking after November 18, 2024.
- Order of Notice (09/24/24)
- En 900 Interconnection Stakeholder Session #1 Agenda for 10/29/24
- En 900 Interconnection and En 900 Schedule
- En 900 Non-Interconnection Agenda for Working Group Session #1 on 11/13/24
- En 900 Summary and Request for Comments Following October 29, 2024 Stakeholder Session
- En 900 Interconnection Technical Session #1 Agenda on 11/18/24
- En 900 Joint Comments from Stakeholders
- En 900 W. Packy Campbell Status Request Letter
- En 900 W. Packy Campbell to Eversource and Public Utilities Commission Regarding Edit Button
- En 900 Summary and Request for Comments Following November 18, 2024, Stakeholder Session
- En 900 Bright Spot Solar Comments Regarding Cost Shifting
- En 900 W. Packy Campbell Comments Regarding En 1000 Rulemaking
- En 900 W. Packy Campbell Comment Regarding SB391 Customer Generation
- En 900 Interstate Renewable Energy Council Comments Set 1
- En 900 Interstate Renewable Energy Council Comments Set 2
- En 900 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-1
- En 900 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-2
- En 900 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-3
- En 900 Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Comments to 1-6 (RR 6)
- En 900 Joint Response to Order of Notice Questions
- En 900 Agenda for Working Group Technical Session #2 on January 14, 2025
- En 900 Draft Initial Proposal (En 900 up to En 909)
RUL 2024-004 - Department of Energy Chapter En 300 Rules for Electric Service
The Department is adopting rules pursuant to its authority over electric utilities under RSA 12-P enacted effective July 1, 2021, as amended effective July 1, 2021. The Chapter En 300 rules are based upon the existing Puc 300 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB 2 (2021).
- En 300 Rules Fiscal Impact Statement Request Cover Letter (04/23/24)
- En 300 Rules Request for Fiscal Impact Statement
- En 300 Fiscal Impact Statement (04/30/24)
- En 300 Rules Initial Proposal
- En 300 Rules Rulemaking Notice Cover Letter (05/09/24)
- En 300 Rules Rulemaking Notice Appendix II-C Form
- En 300 Rules Forms
- En 300 Rules Revised Rulemaking Notice Appendix II-C Form (06/07/24)
- En 300 Rules Eversource Comments to Initial Proposal (07/02/24)
- En 300 Rules Liberty Comments to Initial Proposal (07/02/24)
- En 300 Rules Liberty Additional Comments to Initial Proposal (07/02/24)
- En 300 Rules Unitil Comments to Initial Proposal (07/02/24)
- En 300 Rules OLS Comments to Initial Proposal (08/06/24)
- En 300 Rules OLS Final Comments to Initial Proposal (08/13/24)
- En 300 Rules OLS Comments to Draft Final Proposal (09/12/24)
- En 300 Rules Final Proposal Cover Letter (09/18/24)
- En 300 Rules Appendix II-G Final Proposal Cover Sheet
- En 300 Rules Public Comments Report
- En 300 Rules Final Proposal - Fixed Text
- En 300 Rules Final Proposal - Annotated Text
- En 300 Rules Appendix II-H Incorporation by Reference Statement
- En 300 Rules Forms Cited in En 300 Rules
- En 300 Rules Appendix II-H Incorporation by Reference Statements (Revised) (10/1/24)
- En 300 Rules OLS Comments to Final Proposal (10/2/24)
- En 300 Rules Conditional Approval Request (10/8/24)
- En 300 Rules OLS Comments to Conditional Approval (10/10/24)
- En 300 Rules Amended Conditional Approval Request (10/16/24)
- En 300 Rules OLS Comments to Amended Conditional Approval (10/24)
- En 300 Rules OLS Conditional Approval Letter (10/17/24)
- En 300 Rules Conditional Approval Response Cover Letter (10/18/24)
- En 300 Rules Commissioner Approval of Conditional Approval Response
- En 300 Rules Conditional Approval Response
- En 300 Rules OLS Conditional Approval Confirmation Letter (10/18/24)
- En 300 Rules Forms - Final
- En 300 Rules Adopted Rules Cover Letter (10/22/24)
- En 300 Rules Adopted Rules
- En 300 Rules Adoption Receipt (10/22/24)
RUL 2024-003 - Department of Energy Chapter En 400 Rules for Telephone Utilities
The Department is adopting rules pursuant to its authority over telephone utilities under RSA 12-P enacted effective July 1, 2021, RSA 365:1, RSA 374:3 & :4, RSA 374:22-p and RSA 374:59, as amended effective July 1, 2021, and RSA 274:22-g as amended effective August 20, 2022. The Chapter En 400 rules are based upon the existing Puc 400 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB 2 (2021).
- En 400 Rules Fiscal Impact Statement Request Cover Letter (02/12/24)
- En 400 Rules Request for Fiscal Impact Statement
- En 400 Rules Initial Proposal
- En 400 Rules Fiscal Impact Statement (02/20/24)
- En 400 Rules Rulemaking Notice Cover Letter (3/6/24)
- En 400 Rules Rulemaking Notice Appendix II-C Form
- En 400 Rules Forms
- En 400 Rules OLS Comments to Initial Proposal (04/26/24)
- En 400 Rules OLS Comments to Initial Proposal (05/10/24)
- En 400 Rules OLS Comments to Initial Proposal (05/21/24)
- En 400 Rules Final Proposal Cover Letter (05/29/24)
- En 400 Rules Appendix II-G Final Proposal Cover Sheet
- En 400 Rules Public Comments Report
- En 400 Rules Final Proposal - Fixed Text
- En 400 Rules Final Proposal - Annotated Text
- En 400 Rules Conditional Approval Request (06/13/24)
- En 400 Rules OLS Conditional Approval Request Packet (06/14/24)
- En 400 Rules OLS Conditional Approval Letter (06/21/24)
- En 400 Rules Conditional Approval Response Cover Letter (06/26/24)
- En 400 Rules Commissioner's Approval of Conditional Approval Response
- En 400 Rules Conditional Approval Response
- En 400 Rules OLS Conditional Approval Confirmation Letter (06/26/24)
- En 400 Rules Adopted Rules Cover Letter (06/28/24)
- En 400 Rules Adopted Rules
RUL 2024-002 - Department of Energy Chapter En 800 Rules for Underground Utility Damage Prevention Program
The Department is adopting rules pursuant to its authority over the Underground Utility Damage Prevention Program under RSA 12-P:5, IV and RSA 374:50. The Chapter En 800 rules are based upon the existing Puc 800 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB 2 (2021).
- En 800 Rules Fiscal Impact Statement Request Cover Letter (02/09/24)
- En 800 Rules Request for Fiscal Impact Statement
- En 800 Rules Initial Proposal
- En 800 Rules Fiscal Impact Statement (02/20/24)
- En 800 Rules Rulemaking Notice Cover Letter (02/21/24)
- En 800 Rules Rulemaking Notice Appendix II-C Form
- En 800 Rules OLS Comments to Initial Proposal (05/10/24)
- En 800 Rules OLS Comments to Initial Proposal (05/23/24)
- En 800 Rules Final Proposal Cover Letter (06/11/24)
- En 800 Rules Appendix II-G Final Proposal Cover Sheet
- En 800 Rules Public Comments Report
- En 800 Rules Final Proposal - Fixed Text
- En 800 Rules Final Proposal - Annotated Text
- En 800 Rules Appendix II-H Incorporation by Reference Statement
- En 800 Rules Conditional Approval Request (07/23/24)
- En 800 Rules OLS Conditional Approval Request Meeting Packet (08/01/24)
- En 800 Rules Conditional Approval Request (Revised) (08/01/24)
- En 800 Rules OLS Conditional Approval of Final Proposal Letter (08/15/24)
- En 800 Rules Conditional Approval Response Cover Letter (08/19/24)
- En 800 Rules Commissioner's Approval of Conditional Approval Response
- En 800 Rules Conditional Approval Response
- En 800 Rules OLS Conditional Approval of Final Proposal Letter (08/19/24)
- En 800 Rules Adopted Rule Cover Letter (08/20/24)
- En 800 Rules Adopted Rule
- En 800 Adoption Receipt (08/26/24)
RUL 2024-001 - Department of Energy Chapter En 1200 Rules for Uniform Admin of Utility Customer Relations
The Department is adopting rules pursuant to its authority over utilities under RSA 12-P enacted effective July 1, 2021, RSA 365:1 & :2, as amended effective July 1, 2021, and RSA 363-B as amended effective August 20, 2022. The Chapter En 1200 rules are based upon the existing Puc 1200 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB 2 (2021).
- En 1200 Rules Fiscal Impact Statement Request Cover Letter (01/12/24)
- En 1200 Rules Request for Fiscal Impact Statement
- En 1200 Rules Initial Proposal
- En 1200 Rules Fiscal Impact Statement (01/23/24)
- En 1200 Rules Rulemaking Notice Cover Letter (02/12/24)
- En 1200 Rules Rulemaking Notice Appendix II-C Form
- En 1200 Rules OLS Comments on Rulemaking Form
- En 1200 Rules OLS Comments on Initial Proposal
- En 1200 Rules Revised Rulemaking Notice Appendix II-C Form
- En 1200 Rules Revised Initial Proposal
- En 1200 Rules OLS Comments on Initial Proposal (04/10/24)
- En 1200 Rules Final Proposal Cover Letter (04/16/24)
- En 1200 Rules Appendix II-G Final Proposal Cover Sheet
- En 1200 Rules Public Comments Report
- En 1200 Rules Final Proposal - Fixed Text
- En 1200 Rules Final Proposal - Annotated Text
- En 1200 Rules Consumer Rights and Responsibilities Pamphlet
- En 1200 Rules Adopted Rule Cover Letter (05/29/24)
- En 1200 Rules Adopted Rules
- En 1200 Rules Final Rules
RUL 2023-005 - Department of Energy Chapter En 1500 Rules for Licenses for Crossings of Public Waters or State Land
The Department is adopting rules pursuant to its authority under RSA 12-P:5, IV and RSA 371:22 relating to applications for licenses regarding crossings over public waters or State land.
- En 1500 Rules Fiscal Impact Statement Request Cover Letter (12/14/23)
- En 1500 Rules Request for Fiscal Impact Statement
- En 1500 Rules Initial Proposal
- En 1500 Rules Fiscal Impact Statement (12/19/23)
- En 1500 Rules Rulemaking Notice Cover Letter (12/27/23)
- En 1500 Rules Rulemaking Notice Appendix II-C Form
- En 1500 Rules OLS Comments on Rulemaking Form (01/02/24)
- En 1500 Rules OLS Comments on Initial Proposal (01/02/24)
- En 1500 Rules Revised Rulemaking Notice Appendix II-C Form (01/03/24)
- En 1500 Rules Revised Initial Proposal
- En 1500 Rules OLS Comments on Revised Initial Proposal (03/19/24)
- En 1500 Rules Final Proposal Cover Letter (03/29/24)
- En 1500 Rules Appendix II-G Form Cover Sheet
- En 1500 Rules Final Proposal - Fixed Text
- En 1500 Rules Final Proposal - Annotated Text
- En 1500 Rules Appendix II-H Incorporation By Reference Statement
- En 1500 Rules Public Comment Hearing Report
- En 1500 Rules Conditional Approval Request (04/08/24)
- En 1500 Rules JLCAR Conditional Approval Meeting Packet (Consent) (04/11/24)
- En 1500 Rules OLS Conditional Approval Letter (04/23/24)
- En 1500 Rules Conditional Approval Response Cover Letter (04/24/24)
- En 1500 Rules Commissioner's Approval of Conditional Approval Response
- En 1500 Rules Conditional Approval Response
- En 1500 Rules OLS Conditional Approval Confirmation Letter (04/24/24)
- En 1500 Rules Adopted Rule Cover Letter (04/25/24)
- En 1500 Rules Adopted Rules
RUL 2023-004 - Department of Energy Chapter En 700 Rules for Sewer Utilities
The Department is adopting rules pursuant to its authority over sewer utilities under RSA 12-P, RSA 362, RSA 370 and RSA 374, as amended effective July 1, 2021. The En 700 rules are based upon the existing Chapter Puc 700 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB2 (2021).
- En 700 Rules Fiscal Impact Statement Request Cover Letter (08/16/23)
- En 700 Rules Request for Fiscal Impact Statement
- En 700 Rules Initial Proposal
- En 700 Rules Fiscal Impact Statement (08/18/23)
- En 700 Rules Initial Proposal Cover Letter (08/24/23)
- En 700 Rules Rulemaking Notice Appendix II-C Form
- En 700 Rules Revised Initial Proposal
- En 700 Rules OLS Comments to Revised Initial Proposal (08/28/23)
- En 700 Rules OLS Comments to Rulemaking Notice
- En 700 Rules Public Comment Hearing Transcript (10/04/23)
- En 700 Rules OLS Comments to Revised Initial Proposal (11/03/23)
- En 700 Rules OLS Comments to Revised Initial Proposal (11/13/23)
- En 700 Rules Final Proposal Cover Letter (01/19/24)
- En 700 Rules Appendix II-G Final Proposal Cover Sheet
- En 700 Rules Report of Public Comments
- En 700 Rules Final Proposal - Fixed Text
- En 700 Rules Final Proposal - Annotated Text
- En 700 Rules OLS Comments to Final Proposal (02/05/24)
- En 700 Rules Conditional Approval Request (02/08/24)
- En 700 Rules OLS Comments to Conditional Approval Request (02/14/24)
- En 700 Rules Amended Conditional Approval Request Cover Letter (02/29/24)
- En 700 Rules Amended Conditional Approval Request
- En 700 Rules OLS Conditional Approval Letter (03/18/24)
- En 700 Rules Conditional Approval Response Cover Letter (03/18/24)
- En 700 Rules Commissioner's Approval of Conditional Approval Response
- En 700 Rules Conditional Approval Response
- En 700 Rules OLS Confirmation Letter (03/18/24)
- En 700 Rules Adopted Rules Cover Letter (03/20/24)
- En 700 Rules Adopted Rules
- En 700 Rules Final Rules
RUL 2023-003 - Department of Energy Chapter En 600 Rules for Water Service
The Department is adopting rules pursuant to its authority over water utilities under RSA 12-P, RSA 362, RSA 370 and RSA 374, as amended effective July 1, 2021. The En 600 rules are based upon the existing Chapter Puc 600 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB2 (2021).
- En 600 Rules Fiscal Impact Statement Request Cover Letter (08/16/23)
- En 600 Rules Request for Fiscal Impact Statement
- En 600 Rules Initial Proposal
- En 600 Rules Fiscal Impact Statement (08/18/23)
- En 600 Rules Rulemaking Notice Cover Letter (08/24/23)
- En 600 Rules Rulemaking Notice Appendix II-C Form
- En 600 Rules OLS Initial Proposal Comments (08/28/23)
- En 600 Rules Revised Rulemaking Notice (08/30/23)
- En 600 Rules Revised Initial Proposal
- En 600 Rules Lakes Region Water Co. Inc. Comments
- En 600 Rules NH Brown Law Comments
- En 600 Rules Public Comment Hearing Transcript (10/04/23)
- En 600 Rules OLS Comments to Revised Initial Proposal (11/03/23)
- En 600 Rules OLS Comments to Revised Initial Proposal (11/13/23)
- En 600 Rules Final Proposal Cover Letter (01/19/24)
- En 600 Rules Appendix II-G Final Proposal Cover Sheet
- En 600 Rules Report of Public Comments
- En 600 Rules Final Proposal - Fixed Text
- En 600 Rules Final Proposal - Annotated Text
- En 600 Rules Appendix II-H Incorporation by Reference Statement
- En 600 Rules OLS Comments to Final Proposal (02/06/24)
- En 600 Rules Conditional Approval Request (02/08/24)
- En 600 Rules OLS Comments to Conditional Approval Request (02/13/24)
- En 600 Rules Amended Conditional Approval Request Cover Letter (02/29/24)
- En 600 Rules Amended Conditional Approval Request
- En 600 Rules OLS Conditional Approval Letter (03/15/24)
- En 600 Rules Conditional Approval Response Cover Letter (03/18/24)
- En 600 Rules Commissioner's Approval of Conditional Approval Response
- En 600 Rules Conditional Approval Response
- En 600 Rules OLS Confirmation Letter (03/18/24)
- En 600 Rules Adopted Rules Cover Letter (03/20/24)
- En 600 Rules Adopted Rules
RUL 2023-002 - Department of Energy Chapter En 500 Rules for Gas Service
The Department is adopting rules pursuant to its authority over gas utilities under RSA 12-P, RSA 362, RSA 369, RSA 370 and RSA 374, as amended effective July 1, 2021. The En 500 rules are based upon the existing Chapter Puc 500 rules of the Public Utilities Commission in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB2 (2021).
- En 500 Rules Fiscal Impact Statement Request Cover Letter (04/12/23)
- En 500 Rules Request for Fiscal Impact Statement
- En 500 Rules Initial Proposal
- En 500 Rules Fiscal Impact Statement (03/24/23)
- En 500 Rules Rulemaking Notice Cover Letter (04/28/2023)
- En 500 Rules Rulemaking Notice Appendix II-C Form
- En 500 Rules OLS Initial Proposal Comments (05/09/23)
- En 500 Rules Revised Initial Proposal (05/11/23)
- En 500 Rules OLS Revised Initial Proposal Comments (07/31/23)
- En 500 Rules Final Proposal Cover Letter (09/19/23)
- En 500 Rules Appendix II-G Cover Sheet for Final Proposal
- En 500 Rules Final Proposal - Fixed Text
- En 500 Rules Final Proposal - Annotated Text
- En 500 Rules Appendix II-H Incorporation by Reference Statements
- En 500 Rules OLS Final Proposal Comments (10/10/23)
- En 500 Rules Conditional Approval Request Text (10/12/23)
- En 500 Rules OLS Conditional Approval Comments (10/16/23)
- En 500 Rules OLS Conditional Approval Letter (10/19/23)
- En 500 Rules Conditional Approval Response Cover Letter (10/23/23)
- En 500 Rules Conditional Approval Response
- En 500 Rules OLS Conditional Approval Confirmation Letter (10/23/23)
- En 500 Rules Adopted Rules Cover Letter (10/24/23)
- En 500 Rules Adopted Rules Text
- En 500 Rules Final Rules
RUL 2023-001 - Department of Energy Chapter En 1400 Rules for Pipeline Public Utilities
The Department is adopting rules pursuant to its authority over pipeline public utilities under RSA 12-P and RSA 374, as amended effective July 1, 2021. En 1400 includes substantially the same rules as Parts Puc 1401, 1402, and 1403 of the existing Chapter Puc 1400 rules of the Public Utility Commission (PUC) in order to effectuate the allocation of responsibilities between the Department and the Commission enacted by HB2 (2021).
- En 1400 Rules Fiscal Impact Statement Request Cover Letter (03/21/23)
- En 1400 Rules Request for Fiscal Impact Statement
- En 1400 Rules Initial Proposal
- En 1400 Rules Fiscal Impact Statement (03/24/23)
- En 1400 Rules Initial Proposal Cover Letter (04/03/23)
- En 1400 Rules Rulemaking Notice Appendix II-C Form
- En 1400 Rules OLS Initial Proposal Comments (04/12/23)
- En 1400 Rules Revised Rulemaking Notice Appendix II-C Form (04/12/23)
- En 1400 Rules Revised Initial Proposal
- En 1400 Rules Final Proposal Cover Letter (06/21/23)
- En 1400 Rules Appendix II-G Final Proposal Cover Sheet
- En 1400 Rules Final Proposal - Fixed Text
- En 1400 Rules Final Proposal - Annotated Text
- En 1400 Rules Appendix II-H Incorporation by Reference Statement
- En 1400 Rules OLS Final Proposal Comments (07/10/23)
- En 1400 Rules Conditional Approval Request (07/10/23)
- En 1400 Rules OLS Comments on Conditional Approval (07/12/23)
- En 1400 Rules OLS Conditional Approval Letter (07/21/23)
- En 1400 Rules Conditional Approval Response Cover Letter (07/27/23)
- En 1400 Rules Commissioner Approval of Conditional Approval Response
- En 1400 Rules Conditional Approval Response
- En 1400 Rules Adopted Rules Cover Letter (08/03/23)
- En 1400 Rules Adopted Rules
- En 1400 Rules Final Rules
RUL 2022-001 - Department of Energy Chapter En 1300 Utility Pole Attachment Rules
The Department is adopting rules pursuant to its authority related to utility pole attachments under RSA 12-P and RSA 374, as amended effective July 1, 2021. En 1300 includes substantially the same rules as Parts Puc 1301, 1302, and 1303 of the existing Chapter Puc 1300 rules of the Public Utilities Commission (PUC), except for the addition of provisions for One-Touch Make-Ready procedures and timelines as required under Senate Bill 88 (2021). Part Puc 1304, which covers dispute resolution and related pole attachment fee rate-setting, will remain with the PUC in an amended version of Puc 1300.
- En 1300 Rules Fiscal Impact Statement Request Cover Letter
- En 1300 Rules Request for Fiscal Impact Statement
- En 1300 Rules Initial Proposal
- En 1300 Rules Fiscal Impact Statement
- En 1300 Rules Rulemaking Notice Cover Letter (04/06/22)
- En 1300 Rules Rulemaking Notice Appendix II-C Form
- En 1300 Rules Eversource Comments (06/21/22)
- En 1300 Rules Liberty Comments (06/21/22)
- En 1300 Rules Unitil Comments (06/21/22)
- En 1300 Rules NHEC Comments (06/21/22)
- En 1300 Rules NECTA Comments (06/21/22)
- En 1300 Rules Crown Castle Fiber Comments (06/21/22)
- En 1300 Rules Final Proposal Filing Cover Letter
- En 1300 Rules Appendix II-G Cover Sheet for Final Proposal
- En 1300 Rules Final Proposal-Fixed Text
- En 1300 Rules Final Proposal-Annotated Text
- En 1300 Rules Appendix II-H Incorporation by Reference Statement (NESC)
- En 1300 Rules Appendix II-H Incorporation by Reference Statement (Telcordia Blue Book)
- En 1300 Rules OLS Comments on Final Proposal
- En 1300 Rules Conditional Approval Request Filing Cover Letter
- En 1300 Rules Conditional Approval Request Text
- En 1300 Rules OLS Comments on Conditional Approval Request
- En 1300 Rules JLCAR Preliminary Objection Letter
- En 1300 Rules Response to JLCAR Preliminary Objection Cover Letter
- En 1300 Rules Response to JLCAR Preliminary Objection Rules Revisions
- En 1300 Rules Adopted Rules
- En 1300 Rules Final Rules